5 MEP Mistakes That Cost You Long After Handover
Back to Journal
MEP·5 min read

5 MEP Mistakes That Cost You Long After Handover

Undersized electrical panels are the most common issue we find in homes we’re asked to renovate a second time. A panel sized for the appliances a family owned in 2018 rarely accounts for the induction hob, EV charger and home office setup they have now.

Concealed plumbing without accessible inspection points is the second — when a pipe fails behind a marble wall, the repair costs more than the wall did.

We size every MEP system for where a home is going, not just where it is today, and we always leave inspection access on concealed runs.

More from the Journal

Have a project in mind?

Book a free consultation and let's talk specifics.

Book a Free Consultation
AI